Xytecs worked with Energyline in the assessment of several failed jumper palms, to determine the proximate cause of early in-service failure. Following our own investigative approach, we carried out initial non-destructive inspections of the samples, followed by increasingly destructive testing, to minimise the loss of evidence.
Our inspection revealed ‘bulging’, longitudinal cracking, and evidence of conductor movement, suggesting increased internal pressure. The cause of this increased pressure was suggested to be related to cyclical freezing and melting of entrapped water, but this is yet to be shown as part of our investigation.


