Our Blog
Catch up on breakthroughs and industry news.
NIA-Funded Project in partnership with SSENTransmission
NIA-Funded Project in partnership with SSEN Transmission: Developing Improved Non-Intrusive Foundation Condition Assessment Techniques We are excited to announce a...
Non-Intrusive Foundation Assessment
As part of a larger scope of works, Xytecs were involved in the testing, processing and reporting of a reies...
Safety Calculations for Lifting Equipment
Xytecs were asked to carry out pressure calculations on four mobile elevation working platforms (MEWPs), as part of larger project...
Forensic Inspection of Faulty Jumper Palm Joints
Xytecs worked with Energyline in the assessment of several failed jumper palms, to determine the proximate cause of early in-service...
Lead Dissipation Risk Assessment
The presence and handling of lead in paints is an enormous issue, not only in UK power but worldwide. Xytecs...
Strand Flattening Deformation
Following a previous investigation into a conductor failure, significant deformation of several samples was observed, appearing to be “flattening” of...
Factory Acceptance Testing
Xytecs have been travelling across Europe this February, conducting factory acceptance testing at several manufacturing facilities for the power industry....
Refurbishment of Cormon Equipment
Following refurbishment of our legacy conductor condition survey (CCS) 'Cormon' equipment, we have carried out maintenance and repair works on...
Identification and Characterization of Formed-wire Conductors
As part of our standard assessment of OHL conductors, Xytecs were asked to identify and characterise a sample of formed-wire...
Steelwork Condition Assessment
Xytecs received several secondary members from towers along a route being considered for refurbishment. Because of the advanced age of...
Grease Drop Point Investigation
In addition to our standard conductor assessment service, Xytecs were asked to provide an investigation and recommendations into the quality...
Study of Heat Transfer Through Cable
Energy loss via the dissipation of heat is a significant design and installation restriction for underground power cabling. In order...
Let’s get started!
Whether you need a long-term technology partner or a one-off solution, we are here to make you operationally slicker, financially stronger, and ethically better.
Book your discovery call today.







